Camp Pendelton Marine Weapons Range 2011

The Task.
Reyes Construction needed to remove over burden material.
1.1 slope steep for any spider not winched off. Reyes Construction had tried to take a conventional excavator up the slope to remove the excess over-burden material, and blew the track tension seals. They sent a 550 dozer, and could not do the work either. At that moment they made the call to Hillside Equipment Rental.